Tata Peenya – New Haven Value Homes

bim-solutions, precast
Arrow
Arrow
This Project consists of a total of 3,000,000 sq. ft., including approximately 1,750,000 sq. ft. of residential area, distributed amongst 35 towers. The project includes seven types of residential units, with each tower having a different configuration. The towers have G+10, G+12, and G+14 foors, and stand over a cast-in-situ concrete podium and parking garage. ABKJ provided consultancy for our client, Shapoorji Pallonji, in providing engineering and developing detailed information for Precast Concrete fabrication and erection purposes. The scope of work includes Building Information Modeling (BIM) using Revit software, and providing erection drawings and Precast Concrete fabrication shop drawings based on the Revit model.
ArrowArrow
Slider