Harrison South Kitsap Medical Office Building

Port Orchard, Washington
This 2-story, 32,000 sf project included a rooftop-screened mechanical penthouse on the east side, adjacent to an existing medical office building. The ABKJ design utilized an intermediate steel moment frame system for effective and efficient seismic and wind resistance.

Read More

Lincoln Square Mixed-Use

Bellevue, Washington
This hotel contains 502 rooms in a cost-effective, cast-in-place concrete structure with excellent sound attenuation features and optimum views. It also contains conference rooms, a ballroom, an indoor swimming pool, health club, spa facilities, and numerous restaurants.

Read More

Navajo Bridge

Marble Canyon, Arizona
ABKJ provided engineering consultation services to the Arizona Department of Transportation for removing load and geometric restrictions from a 616’ arch bridge over the Grand Canyon of the Colorado River.

Read More

Manyata Tech Park, Phases IV and V

Bangalore, India
This 1.5 million sf office and retail complex is the largest top-down construction project ever performed in India. It includes 12 above-ground levels and 3 below-grade parking levels. ABKJ was awarded the project after performing a peer review and value engineering services that provided the owner more than 20% in structural savings.

Read More

Good Samaritan Hospital Expansion

Puyallup, Washington
This 9-story, 340,000 sf addition includes three new buildings: a Patient Care Tower, a Parking Garage, and a Central Utility Plant. The project added more than 300 beds to the campus.

Read More

Conoco-Phillips Office Tower

Anchorage, Alaska
This vertical expansion project converted a 2-story structure into a 22-story, 440,000 sf high-rise office tower in two phases. The framing above the ground floor is structural steel with the lateral loads resisted by six ductile moment-resisting frames, four exterior frames around the perimeter, and two diagonal interior frames.

Read More

Houghton Solid Waste Transfer Station

Kirkland, Washington
This replacement design required the facility to be operational at 80% capacity during construction. ABKJ devised a means of raising and retrofitting the existing roof structural framing one half at a time to allow the station open for the entire construction duration.

Read More

Overlake Medical Center South Tower

Bellevue, Washington
This 5-story, 200,000 sf expansion added four levels of underground parking, a 40-bed emergency trauma center, six new operating rooms, and a new acute care center.

Read More

Tanasbourne Medical Office Building

Hillsboro, Oregon
This 3-story structure was the first of four new medical office buildings on the Providence Tanasbourne Health Center campus. A special concentric steel-braced frame system was utilized for effective and efficient seismic and wind resistance.

Read More

Sharp Memorial Hospital Modernization

San Diego, California
This 7-story, 325,000 sf addition and 30,000 sf of renovation added 334 beds to the facility. The addition houses relocated acute care and ICU nursing units, the surgical suite, and emergency departments.

Read More