This replacement design required the facility to be operational at 80% capacity during construction. ABKJ devised a means of raising and retrofitting the existing roof structural framing one half at a time to allow the station open for the entire construction duration.
Awards:
2011 Project of the Year (under $5 million) - American Public Works Association Washington Chapter