Distribution Center

Bothell, Washington
This 270′ x 648′ high bay facility with partial office mezzanine (262,000 sf) has a storage live load of 350 psf. Constructed of concrete tilt-up wall panels this facility has truck loading docks and ramps with a 27’ height clearance.

Read More

Houghton Solid Waste Transfer Station

Kirkland, Washington
This replacement design required the facility to be operational at 80% capacity during construction. ABKJ devised a means of raising and retrofitting the existing roof structural framing one half at a time to allow the station open for the entire construction duration.

Read More