This 450,000 sf structural steel data center was designed to N+1 redundancy and built in two phases. Project included 120,000 sf raised floor computer rooms, isolation slabs for generators and chillers heavy piping loads and corridors, support for overhead bus ducts and cable trays and concrete bases for 12 cooling towers. The project incorporated pier foundations to account for expansive soils.